Officially Open! View our CLT building “ribbon” cutting:

Thank you to all who joined the celebration of the opening of our CLT building, the first complete CLT in New York State. While cutting a ribbon is as common as champagne for celebrations of this sort, we opted to go with something a bit more “us”. Surrounded by a crowd of co-workers and fans, our fearless leader, Jonathan, wielded a chain saw to cut a timber at the main entry. See the sawdust fly in our symbolic opening:

It has been quite a ride involving nearly every coworker to create this building. We’re excited to have our fine woodworkers of NEWwoodworks settling in and sharing their craft with us daily. Our sister company, Pioneer Millworks, is enjoying smooth shipping and receiving from their new storage space at the back of the building. We’re anxious to experience the performance of this structure over the typically bitter New York winter. We have high expectations from the combination of CLTs, timber frame, and wood fiber (out-sulation).

If you’d like to see the opening ceremony event in its entirety check below. And for other vids of our adventures check out our YouTube page.

Gathering for the ribbon cutting official opening of our Cross Laminated Timber building.

Final Panels: Custom Tree Cut-Out Cross Laminated Timber Project

tree corner cltThe final (final!) Cross Laminated Timber (CLT) panels have been installed on our CLT project. Forming the front corner of the building these panels represent a piece of the flexibility of building with solid wood panels and speak to our passion for planet, forest, tree, and wood.

last clt panel install edit web

 

Our fine woodworking division, NEWwoodworks, used ingenuity, software, and CNC tooling to draw, layout, and cut the “tree” design. Our timber frame and construction teams, including Jason, Kevin, and Jim, installed the panels on a chilly Monday morning. Roofing and final enclosure, including wood fiber insulation, are underway.

exterior clt w corner tree

Read more about this build, the First Complete Cross Laminated Timber Project in New York State, in a previous blog post.